New-Construction Shutters in Highpointe, Stuart, FL

Client Requirements
A new-home buyer in Highpointe, Stuart wanted plantation shutters in place as the home closed. The windows included a wide three-panel window and an office window. AP Shutters installed the shutters on the closing date, November 29, 2023.
- Have custom shutters installed on the closing date
- Measure the finished window openings in a newly built home
- Fit a wide three-panel window and an office window
What We Did?
Built to the finished openings
New-construction windows should be measured once the openings are finished. We measured the Highpointe home, built the real-wood shutters in our Palm City shop and installed them on the closing date. The main window received a three-panel shutter layout, and the office window received a two-panel shutter.
Planning notes for new-construction shutters
- Order after the window openings and trim are finished, so the shutters are built to the final dimensions.
- Confirm trim and window details before measuring.
- Typical lead time is 2–3 weeks, so plan the order ahead of your closing date.

Explore related Stuart installations
See more of our work: plantation shutters in Stuart, FL, plantation shutters in Martin County, bay window shutters in Rocky Point, Stuart and sliding door shutters under an arched transom in Stuart.
AP Shutters, the Treasure Coast’s oldest plantation shutter manufacturer (since 1991), measures, builds, finishes and installs custom real-wood shutters from Palm City. Typical lead time is 2–3 weeks. Our limited lifetime warranty covers the shutter and the painted finish.
Discuss your plantation shutter project or call 772-286-2699. Visit our shop and showroom at 3475 SW Palm City School Ave., Palm City, FL.



